REPAINTING BLOCKS ALPHABET
Location : All blocks Event : Repainting all blocks alphabet label Purpose : To ensure easy identification of each block Date : 19 May 2023 Team : Contractor MDT Time : 1:00 PM
Location : All blocks Event : Repainting all blocks alphabet label Purpose : To ensure easy identification of each block Date : 19 May 2023 Team : Contractor MDT Time : 1:00 PM
Location : CCA2 water tank area Event : Repainting elevated piping at ground tank Purpose : To improve looks and keep piping less corrosive Date : 02 May 2023 Team : Contractor MDT Time : 3:00 PM
Location : Block A, block C and block O Event : Repair street signage Purpose : Ensure signage is properly stand and avoid danger to passing by vehicle Date : 09 March 2023 Team : Maintenance Time : 4:00 PM
Location : All areas Event : Removal of bulky items Purpose : Manage common areas to ensure better landscape and avoid rats infection Date : 03 March 2023 Team : Landscape Time : 3:00 PM
Location : Parking line block A – F (Including visitor park) Event : Painting car park lines Purpose : To improve marking of parking space and indicate accessible visitor park Date : 01 March 2023 Team : Maintenance Time : 3:00 PM
Location : Block E, J, L, P, T, O, U, and V Event : Asphalt the street potholes Purpose : To ensure safety and smooth ride to the residents. Date : Team : Contractor MDT Time :
Location : Block E, J, L, P, T, O, U and V Event : Repair and replace street light bulb Date : 12 April 2023 Team : Maintenance Time : 1:00 PM – 4:00 PM
Location : Block E, J, L, P, T, O, U and V Event : Repair and replace corridor and car park light bulb Purpose : To reduce risk of fall light bulb and provide safety Date : 12 May 2023 Team : Maintenance Time : 2:00 PM